Plot 42 Nile Avenue, Kampala
info@arifund.com +256 706 299 896 +1 612 735 9000
Home Ventures GoldX
Anchor Tenant — ADFC · Phase 1 Field Sites — Busia & Namayingo, Eastern Uganda

GoldX
Uganda's Integrated Gold
Infrastructure & Settlement Platform

From artisanal mine to LBMA-grade refinery to insured vault to digital token — GoldX is Uganda's first regulated, end-to-end gold platform. Mercury and cyanide free processing. Every gram of physical gold is verified, refined, custodied, and made investable.

Processing Refining LBMA Custody Tokenisation Settlement
At a Glance
Operator ARIFUND Co. Ltd
Advisor Oakstone Capital
Pilot site Busia & Namayingo — Hg & CN free
Custody LBMA-certified vault operator & transporter
Regulatory framework CMA Regulatory Sandbox · FIA · BoU
Token standard 1 GoldX = 1 gram, 99.99% Au
Pilot status In preparation
ADFC role Anchor tenant
$5.8B Uganda gold exports (2025)
76% of total national exports
~80% ASM gold activity
currently informal
1g Au Per GoldX token
99.99% pure, LBMA-certified
5 layers Fully integrated value chain
mine to market
What it is

Uganda's first regulated,
integrated gold platform

GoldX is a fully integrated gold infrastructure and digital settlement platform developed by ARIFUND Co. Ltd and advised by Oakstone Capital. It connects Uganda's artisanal and small-scale mining (ASM) sector — which accounts for the vast majority of the country's gold output — to world-standard physical infrastructure, regulated custody, and a digital investment layer accessible to domestic and international investors.

The platform operates across five interdependent layers: mobile hard rock processing, partnership-based LBMA-grade refining (located at LAVITT Park), insured vaulting, digital tokenisation, and T+0 cross-border settlement. Each layer is designed to retain value within Uganda's economy rather than allowing it to leak offshore at every stage of the gold value chain. All processing operations use mercury and cyanide free technology — meeting international environmental and health standards for responsible artisanal mining.

GoldX is the anchor tenant of the Arifund Digital Financial Centre (ADFC) at LAVITT Park, Jinja — where partnership-based refining is co-located within the ADFC ecosystem. Physical field processing operations run from two Phase 1 sites: Arifund's own site at Busia (Eastern Uganda) and in collaboration with an artisanal miners cooperative at Namayingo. Processed concentrate from both sites feeds into LAVITT Park's refinery partnership for bullion production and tokenisation.


The opportunity

Uganda's Gold Paradox

Billions in minerals — minimal value retained domestically. Three structural failures define the market.

Value Leaks at Every Stage

Uganda exported $5.8 billion in gold in 2025 — 76% of total national exports. Yet refining margins, vaulting fees, and settlement income all flow to foreign intermediaries. Without domestic infrastructure, Uganda mines the value but cannot retain it.

GoldX captures every link domestically

80% of ASM Gold is Informal

Artisanal and small-scale miners represent the backbone of Uganda's gold sector, yet the vast majority operate outside formal systems — unable to access fair pricing, credit, or institutional markets. Smuggling losses cost the economy billions annually.

Formalisation through a cooperative intake pathway — starting with Namayingo ASM cooperative

No Domestic Refining or Vaulting

Uganda has no LBMA-grade domestic refinery or institutional-grade vaulting facility. Gold is exported as raw doré, forfeiting the refining premium. Investors cannot access physical gold-backed products structured to international standards.

Purpose-built refinery + our LBMA-certified custodian LBMA vault

The solution

Five Integrated Layers

One continuous platform from mine gate to investor portfolio — no breaks in the chain, no value leaking offshore.

1

Processing

Mobile hard rock processing plant — 2 tph pilot capacity. Mercury and cyanide free. Two-stage crushing, grinding circuit, centrifugal concentrator beneficiation. Fully mobile on trailers. Operated at Busia (own site) and Namayingo (ASM cooperative).

Busia & Namayingo — Hg & CN free
2

Refining

99.99% purity output. LBMA-grade bullion bars produced at the LAVITT Park refinery partnership, Jinja. Fire assay and spectrometry laboratory for independent verification.

World-standard output
3

LBMA Custody

our LBMA-certified vault operator insured vaulting. LBMA-certified storage with full insurance coverage and quarterly independent audit.

our LBMA-certified vault operator
4

Tokenisation

1 GoldX token = 1 gram of 99.99% pure gold. Smart contract issuance on a CMA-approved platform. Fractional ownership from $10,000 (pilot phase).

CMA Sandbox
5

Settlement

T+0 delivery-vs-payment finality. Cross-border transaction capability. FIA AML/CFT compliant. BoU reporting integration.

T+0 Finality

Token economics

1 GoldX Token = 1 Gram of Gold

Every token is backed 1:1 by audited physical gold held in our LBMA-certified custodian LBMA-certified vaults. Redemption into physical gold or fiat is available at any time.

Token Specification

Backing 1 token = 1 gram, 99.99% pure gold
Custody LBMA-certified secure vaults
Insurance Full coverage via our LBMA-certified vault operator
Audit Independent quarterly verification
Redemption Physical gold delivery or fiat equivalent
Platform CMA-approved (subject to sandbox authorisation)

Fee Structure

Minting fee 0.5% on issuance
Annual storage 0.2% p.a. (includes our LBMA-certified custodian custody)
Trading fee 0.3% on secondary market turnover
Settlement fee 0.05% per cross-border transaction
Redemption 1.0% (physical delivery or fiat)
Processing (toll) Competitive per-tonne rate for ASM operators
Proof of Reserves

Four-tier reserve transparency framework

Every token in circulation is matched to a specific gram of physical gold. The reserve chain runs from real-time digital verification through to annual IFRS-standard financial audit — providing investors with continuous assurance at every level.

Daily
Oracle Sync
Real-time digital link between vault inventory and token supply
Monthly
Internal Count
Physical stock reconciliation against the token register
Quarterly
Big-4 Attestation
Independent third-party physical inspection and certification
Annual
IFRS Audit
Full financial audit to international accounting standards

Physical infrastructure

Phase 1 Field Sites — Busia & Namayingo

Two complementary Phase 1 field sites feed concentrate into the LAVITT Park refinery partnership. Busia is Arifund's own processing site; Namayingo operates in partnership with an artisanal miners cooperative.

Mobile Hard Rock Processing Plant

SPEEDMINER mobile hard rock processing plant (2 tph, Phase 1). Fully mobile on trailers — no permanent construction. Mercury and cyanide free. Two-stage crushing, grinding circuit, and centrifugal concentrator beneficiation. Scales as throughput grows. Operated at both the Busia and Namayingo field sites in Phase 1.

Phase 1

Refinery (LAVITT Park, Jinja)

Partnership-based refining at LAVITT Park, Jinja — the refinery is co-located within the GoldX ADFC ecosystem, not at the field processing sites. Partnership arrangements with LBMA-grade refiners bring world-standard 99.99% purity output on site within the special economic zone.

Phase 1

Assay Laboratory

On-site fire assay and spectrometry laboratory for independent gold purity verification at every stage of processing.

Phase 1

our LBMA-certified custodian Vault

LBMA-certified on-site secure storage. Full insurance coverage and quarterly independent audit. Directly integrated with the tokenisation engine.

our LBMA-certified vault operator

Site Security

Perimeter and electronic security infrastructure meeting the requirements of LBMA-approved custody operations and insurance standards.

Phase 1

Digital Platform Integration

API oracle connecting vault inventory directly to token issuance. Investor web and mobile portal for primary issuance and secondary market access.

Phase 1

Scale roadmap

Busia & Namayingo → West Nile → Ibanda

The GoldX model is designed to replicate across Uganda's key gold-producing corridors following successful pilot operations and regulatory clearance.

Phase 1 — Dual Pilot Sites

Busia & Namayingo

Eastern Uganda

Busia (own site): Arifund's own processing site in the Eastern Uganda gold corridor, on the Uganda–Kenya border.
Namayingo (ASM cooperative): Operating in partnership with a registered artisanal miners cooperative on the shores of Lake Victoria.
Plant: Mobile hard rock processing plant — 2 tph, mercury & cyanide free, scalable.
Refining: Concentrate from both sites is refined at the LAVITT Park refinery partnership, Jinja.
Regulatory: CMA Sandbox · FIA · MEMD · NEMA

In preparation
Phase 2 — West Nile

West Nile Hub

Northern Uganda — Yumbe, Koboko, Maracha

Licences held: EL/0647 Yumbe · TN/EL/5528 Yumbe
Supply: Northern Uganda gold belt + DRC cross-border supply corridor
Processing: Additional mobile units — scaled throughput
Focus: Volume scale-up, institutional investor onboarding, expanded token issuance

Post-sandbox
Phase 3 — Ibanda & Expansion

Ibanda Mining Hub

Western Uganda · Kabarole · Buhweju

Licences held: EL/0676 Ibanda · EL/0645 Kabarole · EL/0646 Buhweju
Minerals: Gold + polymetallic (Cu-Ni-Co-Zn deposits)
Focus: Pan-East-Africa expansion, strategic acquisitions, platform IPO / token exchange listing

Long-term

Regulatory pathway

Governance & Regulatory Framework

GoldX is designed from the ground up for regulatory compliance across Uganda's financial, mining, and environmental frameworks — and is pursuing authorisation under the CMA Regulatory Sandbox as Uganda's first regulated gold tokenisation product.

Regulator Licence / Approval Framework
Capital Markets Authority (CMA) Regulatory Sandbox Authorisation First Real-World Asset tokenisation in East Africa under CMA oversight. 24-month sandbox with consumer protection safeguards, monthly reporting, and joint oversight with FIA and BoU. On-ramp to full capital markets licence post-sandbox.
Financial Intelligence Authority (FIA) AML/CFT Compliance Framework Automated KYC/AML compliance engine. Dedicated AML officer. Real-time transaction monitoring. FIA reporting integration at settlement layer.
Bank of Uganda (BoU) Payment Systems — Reporting Integration Cross-border settlement reporting aligned with BoU requirements. Integration with BoU's gold-purchasing programme for licensed Ugandan miners.
Ministry of Energy & Mineral Development (MEMD) Gold Dealer's Licence · Mineral Licences ARIFUND holds a portfolio of active mineral licences across Uganda — including Exploration Licences in Kabarole (EL/0645), Buhweju (EL/0646), Yumbe (EL/0647), Ibanda (EL/0676), a Transfer Notice Exploration Licence at Yumbe (TN/EL/5528), a Prospecting Licence (PL0000000749, valid through June 2026), and a Mineral Dealers Licence. Mining licence applications are in progress across key areas.
National Environment Management Authority (NEMA) Environmental & Social Impact Assessment ESIA process for Busia physical site. Environmental and community engagement requirements for processing plant installation and LAVITT Park refinery construction.
our LBMA-certified vault operator / LBMA Custody Standards · Quarterly Audit All physical gold held to LBMA Good Delivery standards. our LBMA-certified custodian provides custody, insurance, and independent quarterly physical audit of vault inventory against the token register.

Risk management

Comprehensive Safeguard Framework

GoldX is structured with layered risk mitigation across regulatory, custody, technology, operational, market, and compliance dimensions.

Regulatory Risk

CMA sandbox oversight with monthly regulatory reporting. Joint oversight structure with FIA and BoU. On-ramp provisions to full licence built into sandbox design.

Custody Risk

our LBMA-certified vault operator insurance and LBMA-certified standards. Quarterly independent physical audit of vault inventory. Full insurance coverage at all times.

Technology Risk

Independent security audit of the digital platform. Bug bounty programme. Technology provider SLA with performance commitments and CMA oversight.

Operational Risk

EPC performance bonds on physical construction. Phased construction approach reducing execution risk. Experienced mineral development team with local operational track record.

Market Risk

Partial output hedging programme. Diversified revenue streams across processing, refining, custody, tokenisation, and settlement reduce single-source exposure.

Compliance Risk

Dedicated AML compliance officer. Automated real-time transaction monitoring. FIA-aligned reporting framework. Active kill criteria in sandbox phase to protect investors and consumers.


Investment Highlights
Structure
Equity · Convertible Note · Token Pre-Sale
Pilot Operator
ARIFUND Co. Ltd — active Exploration, Prospecting & Dealers Licences (mining applications in progress)
Custody
our LBMA-certified vault operator — LBMA-certified
Regulatory pathway
CMA Sandbox → Full licence
Revenue model
Five diversified streams — processing, refining, custody, tokenisation, settlement
Adviser
Oakstone Capital — CMA Licensed Investment Adviser

Interested in GoldX?

GoldX is pursuing its CMA Regulatory Sandbox authorisation as Uganda's first regulated gold tokenisation platform. Qualified investor enquiries are welcome — contact Oakstone Capital to learn more.